Following very heavy rain, Christmas Day produced the first high water pulse of the winter on the Tummel. This flushed out lots of debris in the way of fallen timber and the like from further upstream and peaked at lunch time at about 7 feet above summer height.
|
The new Pitlochry Dam Visitor Centre (not yet open) overlooking high water at
Pitlochry Dam with the dam spilling 25/12/16, 1300 hrs
|